Page 46 -
P. 46

46          ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORT 2020                                                                                                                        ENSURING HEALTH AND SAFETY       47









                                                                                                                                   As a result of our efforts, serious gas-related accidents   To build on the process risk assessment skills of our
            Comprehensive Monitoring                                     Progress                                                  have decreased 84 per cent in last five years.    staff, we have been developing a HAZOP Studies
                                                                         Areas                                                                                                       Talent Pool and organised a two-day HAZOP Practical
            We continuously monitor our facilities in order to identify
            potential hazards and mitigate risks while looking for                                                                  Serious gas-related accidents                    Tournament. A total of 26 staff members started
            ways to make improvements.                        Safety Performance                                                    2016                               13            the certification process and are expected to obtain
                                                                                                                                                                                     HAZOP  Professional  Certification  by  the  China
                                                              Hong Kong                                                                                                              Chemical Safety Association in 2021.
            From our 24-hour Grid Control Centre at our North                                                                       2017                   8
            Point headquarters in Hong Kong, we are able to   Throughout the year, we conducted 141,427 trench                      2018                       10
            monitor our network in real time. We also conduct a   inspections at 8,866 active sites and surveyed                                                                     Safer Operations through Technology
            gas pipe leakage survey at least once a year and carry   6,662 km of pipeline in order to reduce gas incidents.         2019                   8
            out regular trench inspections of our gas pipes and                                                                                                                      At Towngas, harnessing new technology allows us to
            other facilities.                                  Gas incidents reported by the public                                 2020     2                                       ensure our facilities are safe and operating properly, in
                                                               per 10 km of gas pipes                                                                                                keeping with our philosophy of “Growth = innovation x

            In mainland China, the general managers of mainland   2016                          0.180                              New Energy                                        implementation”.
            utility business  JVs conduct a  safety  inspection   2017                       0.165
            every month to identify and address any issues that                                                                    In 2020, we conducted safety inspections for all our   In 2020, we applied
            may arise. Safety and risk management audits of    2018                      0.145                                     chemical plants in mainland China that were either   AI to monitor third party
            our utility JV partners are conducted once every two                                                                   in operation or under construction and organised six   construction  works near
            years, while PSM audits for our chemical plants are   2019               0.117                                         safety audits of our ECO gas filling stations.    our  network to  reduce
            conducted annually.                                2020            0.092                                                                                                 the risk of pipe damage.
                                                                                                                                   Three comprehensive safety inspection programmes   The AI system can identify

            In addition, regular safety and risk management   In 2020, Towngas kept third party damage to its gas                  were specially organised across major JVs to assess   heavy machinery that may
            workshops are organised to improve safety         pipes to a relatively low level. The number of third                 COVID-19 safety measures, as well as lessons learned   endanger our pipelines
            management practices and safety awareness.        party damage incidents in 2020 was seven.                            from the 2020 Beirut port explosion and other major   and trigger visual and
                                                                                                                                   incidents in mainland China.                      audio alarms at sites and
            Community and Industrial Relations                To reduce the risk of mechanical joint leakage and                                                                     send alert messages or
                                                              corrosion, we decommissioned 17 km of aged metal                     By adhering to best practices in PSM, such as     emails to our site staff for
            We connect with stakeholders to enhance their     pipes in our network. In addition, our replacement of                following inherent safety designs and conducting in-  instant follow-up.
            safety  awareness  and  build  trust.  We  also  work   corroded risers project launched in 2019 is expected           depth HAZOP studies and Bowtie Analysis, there were
            closely with the government authorities to formulate   to be completed by 2022.                                        no major incidents at our chemical plants in 2020.  For our pipeline asset records, we adopted an
            strategic plans, such as a facilities utilisation                                                                                                                        innovative photogrammetry methodology. By
            framework and preventive maintenance index, to    To enhance operational resilience, we renovated                      Training and Awareness                            taking photographic images on site, a three-
            ensure optimal safety.                            and upgraded the back-up Corporate Crisis Control                                                                      dimensional (3D) as-built model of the pipeline can
                                                              Centre and Grid Control Centre.                                      In 2020, many training activities were moved online in   be generated to record and store information on
            In order to maintain a high standard of safety not just                                                                mainland  China in  response  to  the  social distancing   our  pipeline  assets  accurately  and  efficiently.  This
            within Towngas but across the industry, we share our   Mainland Utilities                                              measures implemented during the pandemic.         approach also eliminates tedious traditional manual
            safety experience and standards with corporations,                                                                                                                       work.
            contractors and professional organisations.       In 2020, 37 safety and risk management audits were                   These included the e-learning platforms that we launched
                                                              undertaken; the safety performance of our JVs have been              for self-learning and self-assessment by our staff. Web-
            In mainland China, we have taken part in the      steadily improving since the implementation of our audits.           based Safety and Risk Management Workshops  were
            compilation and revision of relevant standards and                                                                     also organised to share experiences on gas pipe
            specifications on both the national and industry levels.   During the pandemic, the general manager of each JV         safety, PSM and good engineering practices. Other
            We have also shared our experience to promote the   increased safety inspections to twice a month and added            online activities included a Gas Engineering Knowledge
            development of the gas industry in mainland China.  an item on  “Special Inspection for the Prevention and             Competition to enhance gas engineering knowledge
                                                              Control of COVID-19” to ensure all JVs were implemented              and strengthen operational safety.
                                                              the specified sanitation and anti-viral measures.
   41   42   43   44   45   46   47   48   49   50   51