Page 80 - 2011_SR_EN

Basic HTML Version

80
Sustainability Report 2011
Review of 2011 Targets
Targets
Progress
Operation and Management
To implement a risk register
programme in ECO’s
processing plants.
Job completed with the implementation
of a risk register system in ECO’s
processing plants.
To start conducting
environmental audits in HCIL
and TCCL joint ventures.
A total of 44 environmental audits were
conducted in 2011.
Safety
To be certified as an
International Safe Workplace
under the framework of the
World Health Organisation’s
Safe Community Programme.
The Hong Kong and China Gas
Company Limited was certified as an
International Safe Workplace.
To develop an electronic safety
information system.
An electronic safety information system
was established.
To develop an emergency
management system for new
energy businesses.
Guidelines for the establishment of
emergency plans for new energy
businesses were issued in July 2011.
An intranet-based incident reporting
system was also developed.
The Environment
To reduce natural gas
consumption by using waste
heat from the phase II
carbonate reboiler.
A waste heat recovery system was
installed at the Tai Po Plant. This system
reduced natural gas consumption of
the hot water boiler by 233,151 cubic
metres in four months.
To achieve a Wastewi$e label
for 10 consecutive cycles.
We obtained our Wastewi$e Label in
10 consecutive cycles, demonstrating
our high commitment to environmental
protection.
To develop environmental key
performance indicators.
20 environmental key performance
indicators were developed for different
departments.
To launch afforestation
schemes in mainland China.
More than 90 companies participated in
the Month of Tree Planting and Carbon
Reduction Programme.